[Hallb-engineering] [New Logentry] Follow-up Re: Torus Helium Level Control

kashy at jlab.org kashy at jlab.org
Tue Apr 10 15:50:03 EDT 2018


Logentry Text:
--
Completed tuning of the Torus supply valve today at  13:35. Flow to hall B has stabilized and so has the liquid level in the Torus due to smaller swings in the JT valve EV8115JT

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3558157
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180410/e9fba547/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc20_20180410_154610.gif
Type: image/gif
Size: 62757 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180410/e9fba547/attachment-0002.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc20_20180410_153909.gif
Type: image/gif
Size: 225172 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180410/e9fba547/attachment-0003.gif>


More information about the Hallb-engineering mailing list