[Hallb-engineering] [Dsg-hallbgas] 2/9 cRIO Reboots
Brian Eng
beng at jlab.org
Fri Feb 9 12:24:12 EST 2018
Hi Denny,
They should be installed/labeled as #1 & #2 on the cRIO, with #1 corresponding to upper & #2 corresponding to lower.
So the upper manifold should be ~250 psig and the lower ~200 psig if everything got wired/programmed correctly.
They're arranged that way in CSS as well, but don't have any labels.
If you want different labels in CSS, let Nathan know.
----- Original Message -----
> From: "Denny Insley" <dinsley at jlab.org>
> To: "Brian Eng" <beng at jlab.org>
> Cc: dsg-hallbgas at jlab.org, "Hallb-eng" <hallb-engineering at jlab.org>
> Sent: Friday, February 9, 2018 12:12:46 PM
> Subject: Re: [Dsg-hallbgas] 2/9 cRIO Reboots
> Brian,
>
> We are going to want to add some labeling to those CO2 sensors in Epics I think.
> The sensors break it down into sets so if we can label them by physical location
> that
> may be best, i.e. "upper" and "lower". I will look at the manifolds and let you
> know
> which is which. Theres no hurry on this so when ever you get the chance is fine.
>
> Thanks
> Denny
More information about the Hallb-engineering
mailing list