[Hallb-engineering] [Dsg-hallbgas] Gas System cRIOs

Brian Eng beng at jlab.org
Fri Jul 20 09:30:31 EDT 2018


Yuri,

While the downtimes will be brief (possibly up to a few minutes to install software, less than a minute for reboots) there will be interruptions in the flow during those times.

Will there be a time next week when it isn't powered on if you want us to hold off on upgrading the cRIO used for the SVT?

----- Original Message -----
> From: "Yuri Gotra" <gotra at jlab.org>
> To: "Brian Eng" <beng at jlab.org>, dsg-hallbgas at jlab.org, "Hallb-eng" <hallb-engineering at jlab.org>
> Sent: Friday, July 20, 2018 9:09:48 AM
> Subject: Re: [Dsg-hallbgas] Gas System cRIOs

> Brian,
> 
> Today we are working on cosmic testing of the new VSCM firmware. SVT is
> cold and powered up. Please make sure there is no interruption of gas
> flow to ensure safe operating conditions for the SVT. Thank you
> 
> 
> On 7/20/18 9:05 AM, Brian Eng wrote:
>> These will be rebooted for updates later today as well as remove functionality
>> that is no longer being used (e.g. DC PID).
>>
>> A separate chassis for the MFCs will be installed in one of the locations (most
>> likely the gas shed) as well.
>> Currently the MFCs are powered via the same chassis that does I/O. Adding this
>> chassis will allow troubleshooting one without effecting the other.