[Hallb-engineering] [New Logentry] Follow-up Re: Follow-up Re:	Torus/Solenoid/Buffer dewar cool down
    kashy at jlab.org 
    kashy at jlab.org
       
    Wed Mar 14 19:45:02 EDT 2018
    
    
  
Logentry Text:
--
My  ability to log in from home has been flakey. I called Chris P from cryo and asked him to reduce the Hall B flow to 5g/s just in case my ability to log in dies completely. I finally was able to get on again.
The Torus is now at 8.5K so I'm limiting the Torus flow to focus more on the Solenoid which is cooling slower (limited button area and long conduction lengths). The solenoid is now at 45K average cold mass temperature and cooling at 0.75K/hr
---
This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3544649
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180314/3004cd2e/attachment.html>
    
    
More information about the Hallb-engineering
mailing list