[Hallb-engineering] [New Logentry] Magnet cRIO Upgrades
beng at jlab.org
beng at jlab.org
Mon May 7 17:50:03 EDT 2018
Logentry Text:
--
The four magnet cRIOs have been upgraded to LabVIEW 2017. Code was recompiled as needed, but no changes were made.
Additionally both the sol-fast and tor-lv cRIOs had firmware updates applied.
Lastly core dump functionality was enabled on both of the fastDAQ cRIOs.
All cRIOs were verified to be operational and any alarms generated were cleared.
---