[Hallb-engineering] Hall access on Monday

Yuri Gotra gotra at jlab.org
Tue Mar 5 10:05:43 EST 2019


We need to take CD alignment runs through this break. Will coordinate 
this with other systems and DAQ experts.

On 3/5/19 9:03 AM, L Smith wrote:
> Mauri,
>
> I asked Adam to leave the forward carriage HV on and I would like to 
> take cosmic runs with the dome lights out if possible.  I can 
> coordinate with other detector groups.
>
> Cole
-------------- next part --------------
A non-text attachment was scrubbed...
Name: gotra.vcf
Type: text/x-vcard
Size: 102 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20190305/ee9adad2/attachment-0002.vcf>


More information about the Hallb-engineering mailing list