[Hallb-engineering] [New Logentry] Hall B 80K warm up

kashy at jlab.org kashy at jlab.org
Thu Nov 12 14:40:03 EST 2020


Logentry Text:
--
Hall B is now flowing 4g/s of clean helium cooled to 80K through 3 parallel loads (Torus ~1.5g/s, Solenoid ~2g/s, Buffer Dewar ~0.5g/s.

This will continue overnight we may need to adjust the balance slightly and may need to add a bit more flow depending on where the temperatures stabilize.




---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3857580
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20201112/95c304a2/attachment.html>


More information about the Hallb-engineering mailing list