Subject: [Esr-users] [New Logentry] Follow-up Re: Hall B Magnet Cool Down
Follow-up Re: Hall B Magnet Cool Down<https://logbooks.jlab.org/entry/3873918>
* Edit<https://logbooks.jlab.org/entry/3873918/edit?destination=email/send>
* Delete<https://logbooks.jlab.org/entry/3873918/delete?destination=email/send>
Lognumber 3873918<https://logbooks.jlab.org/entry/3873918>. Submitted by rmiller<https://logbooks.jlab.org/user/rmiller> on Thu, 04/15/2021 - 16:36<https://logbooks.jlab.org/entries?start_date=1618515403&end_date=1618522603&book=HBSOLENOID&book=HBTORUS&book=CLOG>.
Logbooks: HBSOLENOID<https://logbooks.jlab.org/book/hbsolenoid> HBTORUS<https://logbooks.jlab.org/book/hbtorus> CLOG<https://logbooks.jlab.org/book/clog>
Entry Makers: kashy, cwiggins
References: 3873789 - Hall B Magnet Cool Down<https://logbooks.jlab.org/entry/3873789>
Magnet cool down continues. We started 4.5K flow from esr at 11 am, and are currently taking 6 g/s. Both the torus and solenoid are cooling at 2K/hr.
The system is stable and we will continue with these conditions, using 6 g/s throughout the night.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20210415/83c9d662/attachment.html>
More information about the Hallb-engineering
mailing list