[Hallb-engineering] [New Logentry] Follow-up Re: Hall B Cryo Recovery

kashy at jlab.org kashy at jlab.org
Tue Jul 27 11:15:01 EDT 2021


Logentry Text:
--
Good progress for a while on recovering the Hall B Cryo. But due to the needs of Hall C flow to Hall B was reduced from ~16g/s down to 5g/s. 
Torus at 46.5K
Solenoid at 23.5K
Both still cooling...


---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3888474
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20210727/f6f5a49c/attachment.html>


More information about the Hallb-engineering mailing list