[Hallb-engineering] [EXTERNAL] No beam during day shift today, day shift cancelled.
Maurik Holtrop
maurik at physics.unh.edu
Wed Sep 15 09:05:36 EDT 2021
Dear HPS and Hall-B,
Due to the ongoing work on the separator for Hall-D today, we will again not have beam during day shift. We hope that we can bring the beam back swiftly at the start of swing shift.
If anyone needs access to the hall, we can go to controlled access. Currently we are in "beam permit", but there should be little issue to go to controlled access if needed. The chicane magnet is already powered off.
Best regards,
Maurik
Current RC for HPS.
More information about the Hallb-engineering
mailing list