[Hallb-engineering] [New Logentry] Helium Leak Hunt in Endstations B and C
kashy at jlab.org
kashy at jlab.org
Fri Dec 8 11:10:01 EST 2023
Logentry Text:
--
Chris Carlin, James Brock, Chris Keith and I toured Halls B and C and looked for signs of helium leaks and found none in either Hall.
All cryogenic systems look stable.
Halls will go back to taking beam.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4231590
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20231208/a1293ab9/attachment.html>
More information about the Hallb-engineering
mailing list