[Hallb-engineering] [New Logentry] lowering Buffer Dewar Level to aid in Target connection
kashy at jlab.org
kashy at jlab.org
Wed Sep 27 15:20:03 EDT 2023
Logentry Text:
--
We increased the set point for EV8210A from 5.5 K to 6K and and I lowered the min value of this loop from 35 to 30% to try to let the helium level fall over night.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4188392
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20230927/e2ac8d02/attachment.html>
More information about the Hallb-engineering
mailing list