[Hallb-engineering] [Revised Logentry] Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Hall B solenoid cooldown below 120K
mcookiv at jlab.org
mcookiv at jlab.org
Wed Dec 4 15:10:01 EST 2024
Logentry Text:
--
024-12-04 @ 1504
Solenoid
COIL_T_AVG = 126 K
COIL_DT_Dt_30 = -0.29 K/r
set PV8563C setpoint = 87 K
Torus
87K flow started to Torus - PV8566T @ 7%
EV8111CD continues to be open & EV8111BY is closed. Some warmer gas in the pipe line was sent through the coldmass initially
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4322871
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20241204/03881a22/attachment.html>
More information about the Hallb-engineering
mailing list