[Hallb-engineering] [New Logentry] Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Hall B solenoid cooldown below 120K
gopinath at jlab.org
gopinath at jlab.org
Wed Dec 11 09:25:01 EST 2024
Logentry Text:
--
TORUS
Introducing more 80K flow
EV8111CD slowly opened to 15% from 0%
EV8111BY @50% from 30%
FI8561 @ 5 g/s
CCM_DT_DT30 @ -0.01K/hr, expecting it to go further down
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4323353
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20241211/fec6774f/attachment.html>
More information about the Hallb-engineering
mailing list