[Hallb-engineering] DP8620VCLDP
Brian Eng
beng at jlab.org
Tue May 14 10:04:38 EDT 2024
Torus PLC has been power cycled and is back online.
There are a handful of cryo alarms now though ... I'm guessing PIDs got reset?
Could someone check those?
________________________________
From: Eugene Pasyuk <pasyuk at jlab.org>
Sent: Monday, May 13, 2024 3:58 PM
To: Brian Eng <beng at jlab.org>; Denny Insley <dinsley at jlab.org>; Probir Ghoshal <ghoshal at jlab.org>; Sandesh Gopinath <gopinath at jlab.org>; David Kashy <kashy at jlab.org>; Lamiaa El Fassi <elfassi at jlab.org>
Cc: Hallb-eng <hallb-engineering at jlab.org>; dsg-hallb magnets <dsg-hallb_magnets at jlab.org>
Subject: RE: [Hallb-engineering] DP8620VCLDP
All right then. I’ll ramp down both magnets once they terminate the beam tomorrow morning (~ 7 am). They should be off by 8:30. And we request rapid access. Let me know when you finish the reboot, and we can bring them back up.
-Eugene
From: Brian Eng <beng at jlab.org>
Sent: Monday, May 13, 2024 15:52
To: Denny Insley <dinsley at jlab.org>; Eugene Pasyuk <pasyuk at jlab.org>; Probir Ghoshal <ghoshal at jlab.org>; Sandesh Gopinath <gopinath at jlab.org>; David Kashy <kashy at jlab.org>
Cc: Hallb-eng <hallb-engineering at jlab.org>; dsg-hallb magnets <dsg-hallb_magnets at jlab.org>
Subject: Re: [Hallb-engineering] DP8620VCLDP
Should be fine to just do the reboot after everything is ramped down.
We need to make an access to do the reboot (have to physically power cycle it). I'd like to see if we can connect via USB before the reboot though.
I'd prefer not to upgrade the firmware in a piecemeal fashion (e.g. only the torus) and I'm not sure only 1 shift is enough time to do all of them.
________________________________
From: Denny Insley <dinsley at jlab.org<mailto:dinsley at jlab.org>>
Sent: Monday, May 13, 2024 3:31 PM
To: Eugene Pasyuk <pasyuk at jlab.org<mailto:pasyuk at jlab.org>>; Brian Eng <beng at jlab.org<mailto:beng at jlab.org>>; Probir Ghoshal <ghoshal at jlab.org<mailto:ghoshal at jlab.org>>; Sandesh Gopinath <gopinath at jlab.org<mailto:gopinath at jlab.org>>; David Kashy <kashy at jlab.org<mailto:kashy at jlab.org>>
Cc: Hallb-eng <hallb-engineering at jlab.org<mailto:hallb-engineering at jlab.org>>; dsg-hallb magnets <dsg-hallb_magnets at jlab.org<mailto:dsg-hallb_magnets at jlab.org>>
Subject: Re: [Hallb-engineering] DP8620VCLDP
The concensus is to ramp down and reboot when we lose beam in the morning. Brian what are your thoughts on the matter?
Sent from my Verizon, Samsung Galaxy smartphone
Get Outlook for Android<https://aka.ms/AAb9ysg>
________________________________
From: Hallb-engineering <hallb-engineering-bounces at jlab.org<mailto:hallb-engineering-bounces at jlab.org>> on behalf of Eugene Pasyuk via Hallb-engineering <hallb-engineering at jlab.org<mailto:hallb-engineering at jlab.org>>
Sent: Monday, May 13, 2024 2:59:49 PM
To: Brian Eng <beng at jlab.org<mailto:beng at jlab.org>>; Probir Ghoshal <ghoshal at jlab.org<mailto:ghoshal at jlab.org>>; Sandesh Gopinath <gopinath at jlab.org<mailto:gopinath at jlab.org>>; David Kashy <kashy at jlab.org<mailto:kashy at jlab.org>>
Cc: Hallb-eng <hallb-engineering at jlab.org<mailto:hallb-engineering at jlab.org>>; dsg-hallb magnets <dsg-hallb_magnets at jlab.org<mailto:dsg-hallb_magnets at jlab.org>>
Subject: Re: [Hallb-engineering] DP8620VCLDP
So, what's the verdict?
-Eugene
________________________________
From: Hallb-engineering <hallb-engineering-bounces at jlab.org<mailto:hallb-engineering-bounces at jlab.org>> on behalf of David Kashy via Hallb-engineering <hallb-engineering at jlab.org<mailto:hallb-engineering at jlab.org>>
Sent: Monday, May 13, 2024 11:41
To: Brian Eng <beng at jlab.org<mailto:beng at jlab.org>>; Probir Ghoshal <ghoshal at jlab.org<mailto:ghoshal at jlab.org>>; Sandesh Gopinath <gopinath at jlab.org<mailto:gopinath at jlab.org>>
Cc: Hallb-eng <hallb-engineering at jlab.org<mailto:hallb-engineering at jlab.org>>; dsg-hallb magnets <dsg-hallb_magnets at jlab.org<mailto:dsg-hallb_magnets at jlab.org>>
Subject: Re: [Hallb-engineering] DP8620VCLDP
Hi Eugene,
I'm looking into the possible effect of the "not talking" signals.
Brian,
What signals from the solenoid are not updating in the Torus (DBX) PLC?
I see at some that are updating:
DP8620VCLDP
B_TORUS:LHe:PV8522SR:CVAL = PT8620
B_TORUS:LHe:PV8522SCD_Min_Min:CVAL = LL8620
Thanks Guys
Dave
________________________________
From: Brian Eng <beng at jlab.org<mailto:beng at jlab.org>>
Sent: Monday, May 13, 2024 10:57 AM
To: David Kashy <kashy at jlab.org<mailto:kashy at jlab.org>>; Probir Ghoshal <ghoshal at jlab.org<mailto:ghoshal at jlab.org>>; Sandesh Gopinath <gopinath at jlab.org<mailto:gopinath at jlab.org>>
Cc: Hallb-eng <hallb-engineering at jlab.org<mailto:hallb-engineering at jlab.org>>; dsg-hallb magnets <dsg-hallb_magnets at jlab.org<mailto:dsg-hallb_magnets at jlab.org>>
Subject: Re: DP8620VCLDP
So I poked at the tags some more and it turns out that this one is updated on the DBox PLC, which I can still connect to. So I manually reset the error bit and this value is now updating on the PID screens.
caget B_TORUS:LHe:PV8522SR_Val:CVAL.INP
B_TORUS:LHe:PV8522SR_Val:CVAL.INP @PLC_CRYO PV8522SR_Val.CVAL
The torus PLC still isn't seeing updating values from the solenoid, but maybe we can put off the reboot until tomorrow?
________________________________
From: David Kashy <kashy at jlab.org<mailto:kashy at jlab.org>>
Sent: Monday, May 13, 2024 10:49 AM
To: Brian Eng <beng at jlab.org<mailto:beng at jlab.org>>; Probir Ghoshal <ghoshal at jlab.org<mailto:ghoshal at jlab.org>>; Sandesh Gopinath <gopinath at jlab.org<mailto:gopinath at jlab.org>>
Cc: Hallb-eng <hallb-engineering at jlab.org<mailto:hallb-engineering at jlab.org>>; dsg-hallb magnets <dsg-hallb_magnets at jlab.org<mailto:dsg-hallb_magnets at jlab.org>>
Subject: DP8620VCLDP
Just as a reminder,
This signal is a calculated value base on two pressure sensors.
the math goes as follows:
DP8620VCLDP =PT8620-PT8571
There is a similar setup of
DP8670MAGDP = PT8670-PT8571
Dave
-------------- next part --------------