Logentry Text:
--
@ 0820
COIL_T_AVG = 167K
COIL_DT_Dt_30 = -0.14K/r
set PV8563C setpoint = 140 K

@1235
PV8563C setpoint = 135K


---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4322236