We have sub 90K flowing into the 3 legs of the system with a total flow of 3.5g/s (controlled flow rate by PV8563C).
Flow is going into the TL toward ESR, into the Torus through the 4K supercritical circuit and through the bypass valve of the solenoid (long u-tube needs time to cooldown)
Torus CCM average (cold mass) temp is 93.4K
Solenoid CCM average temp is 103.7K
---