[Hallb-engineering] [New Logentry] Follow-up Re: Follow-up Re: Hall B Solenoid and Torus Cooldown
kashy at jlab.org
kashy at jlab.org
Fri Jan 24 13:25:02 EST 2025
Logentry Text:
--
Cryo needed to protect the ESR system from too much load so they throttled the max position of the supply valve EV6711B.
Flow was running 10g/s farily stabily for about 1 hr prior to that.
This dropped the supply pressure of the SC Helium, so we changed a control loop setpoint to get us less flow but at a higher pressure which is needed to force flow through the long path of the CLAS12 Torus 4 K circuit.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4328022
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20250124/076659b5/attachment.html>
More information about the Hallb-engineering
mailing list