[Hallb-engineering] [New Logentry] Follow-up Re: Follow-up Re: Follow-up Re: Hall B TL Status
kashy at jlab.org
kashy at jlab.org
Sun Jan 26 20:50:02 EST 2025
Logentry Text:
--
Torus and Solenoid Coils are fully cold.
The two magnet reservoirs are full.
The solenoid lead reservoir is full.
Tomorrow we switch from cooldown mode to 4K ops mode and fill the lead reservoir then go to cold return after contacting cryo
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4328333
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20250126/b4cdd2de/attachment.html>
More information about the Hallb-engineering
mailing list