[Hallb-engineering] [New Logentry] Cryogenic Switchover from ESR To ESR2
kashy at jlab.org
kashy at jlab.org
Thu Mar 6 14:00:02 EST 2025
Logentry Text:
--
ESR 1 to ESR 2 switch over began at ~8:36 pm Thursday March 6
Plots to follow the main signals are running in the counting house
At 11:48 we rearranged our valve setup to allow bypassing the magnet cold mass's and flow a batch of warm helium back to our ambient vaporizer at the request of Chris P from Cryo.
At 13:12 we have 100% LL in the Solenoid Lead Reservoir, 50% in the Solenoid Magnet Reservoir, and 60% in the Torus Lead Reservoir. We requested to go to Cold Return to ESR2.
With the intention of slightly reducing the time to recover the Hall B Magnets during operation and after a trip we have requested the Max for EV6711B to go to 60% from 50% and this has been incorporated by Cyro. We also have changed the Setpoint for EV8111CD Liquid Level from 82% to 40%
13:45 Hall B Magnets are on Cold Return with liquid levels satisfied.
Congratulations to the CRYOGENICS Group for a JOB WELL DONE!
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4336598
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20250306/859623c8/attachment.html>
More information about the Hallb-engineering
mailing list