    Hi All,<br>
    Please note there are some significant power, LCW and Chilled water
    outages planned. Please plan accordingly for the items with specific
    dates.<br>
    I'll forward more info as I receive it.<br>
    <br>
    Thanks<br>
    Dave<br>
    <br>
    <br>
    -------- Original Message --------
    <table class="moz-email-headers-table" border="0" cellpadding="0"
      cellspacing="0">
      <tbody>
        <tr>
          <th valign="BASELINE" align="RIGHT" nowrap="nowrap">Subject: </th>
          <td>Integration Notes from Today's Meeting</td>
        </tr>
        <tr>
          <th valign="BASELINE" align="RIGHT" nowrap="nowrap">Date: </th>
          <td>Tue, 08 Mar 2011 11:40:02 -0500</td>
        </tr>
        <tr>
          <th valign="BASELINE" align="RIGHT" nowrap="nowrap">From: </th>
          <td>Walt Akers <a class="moz-txt-link-rfc2396E" href="mailto:akers@jlab.org"><akers@jlab.org></a></td>
        </tr>
        <tr>
          <th valign="BASELINE" align="RIGHT" nowrap="nowrap">To: </th>
          <td>ent <a class="moz-txt-link-rfc2396E" href="mailto:ent@jlab.org"><ent@jlab.org></a>, drew <a class="moz-txt-link-rfc2396E" href="mailto:drew@jlab.org"><drew@jlab.org></a>,
            burkert <a class="moz-txt-link-rfc2396E" href="mailto:burkert@jlab.org"><burkert@jlab.org></a>, Luci
            <a class="moz-txt-link-rfc2396E" href="mailto:lcollins@jlab.org"><lcollins@jlab.org></a>, Marti Bennett
            <a class="moz-txt-link-rfc2396E" href="mailto:bennett@jlab.org"><bennett@jlab.org></a>, harris <a class="moz-txt-link-rfc2396E" href="mailto:harris@jlab.org"><harris@jlab.org></a>,
            manzlak <a class="moz-txt-link-rfc2396E" href="mailto:manzlak@jlab.org"><manzlak@jlab.org></a>, brindza
            <a class="moz-txt-link-rfc2396E" href="mailto:brindza@jlab.org"><brindza@jlab.org></a>, kashy <a class="moz-txt-link-rfc2396E" href="mailto:kashy@jlab.org"><kashy@jlab.org></a>,
            domingoj <a class="moz-txt-link-rfc2396E" href="mailto:domingoj@jlab.org"><domingoj@jlab.org></a>, cuevas
            <a class="moz-txt-link-rfc2396E" href="mailto:cuevas@jlab.org"><cuevas@jlab.org></a>, heyes <a class="moz-txt-link-rfc2396E" href="mailto:heyes@jlab.org"><heyes@jlab.org></a>, kees
            <a class="moz-txt-link-rfc2396E" href="mailto:kees@jlab.org"><kees@jlab.org></a>, syptak <a class="moz-txt-link-rfc2396E" href="mailto:syptak@jlab.org"><syptak@jlab.org></a>,
            "Dennis M. Skopik" <a class="moz-txt-link-rfc2396E" href="mailto:skopik@jlab.org"><skopik@jlab.org></a>, cardman
            <a class="moz-txt-link-rfc2396E" href="mailto:cardman@jlab.org"><cardman@jlab.org></a>, elton <a class="moz-txt-link-rfc2396E" href="mailto:elton@jlab.org"><elton@jlab.org></a>,
            gomez <a class="moz-txt-link-rfc2396E" href="mailto:gomez@jlab.org"><gomez@jlab.org></a>, mestayer
            <a class="moz-txt-link-rfc2396E" href="mailto:mestayer@jlab.org"><mestayer@jlab.org></a>, saw <a class="moz-txt-link-rfc2396E" href="mailto:saw@jlab.org"><saw@jlab.org></a>, Stepan
            Stepanyan <a class="moz-txt-link-rfc2396E" href="mailto:stepanya@jlab.org"><stepanya@jlab.org></a>, ckeith
            <a class="moz-txt-link-rfc2396E" href="mailto:ckeith@jlab.org"><ckeith@jlab.org></a>, Stephanie Tysor
            <a class="moz-txt-link-rfc2396E" href="mailto:stysor@jlab.org"><stysor@jlab.org></a>, Erica Jones
            <a class="moz-txt-link-rfc2396E" href="mailto:eljones@jlab.org"><eljones@jlab.org></a>, abbottd <a class="moz-txt-link-rfc2396E" href="mailto:abbottd@jlab.org"><abbottd@jlab.org></a>,
            <a class="moz-txt-link-abbreviated" href="mailto:whitey@jlab.org">whitey@jlab.org</a>, Carl Zorn <a class="moz-txt-link-rfc2396E" href="mailto:carl.zorn@jlab.org"><carl.zorn@jlab.org></a>, gen
            <a class="moz-txt-link-rfc2396E" href="mailto:gen@jlab.org"><gen@jlab.org></a>, latifa <a class="moz-txt-link-rfc2396E" href="mailto:latifa@jlab.org"><latifa@jlab.org></a>, hcf
            <a class="moz-txt-link-rfc2396E" href="mailto:hcf@jlab.org"><hcf@jlab.org></a>, lerose <a class="moz-txt-link-rfc2396E" href="mailto:lerose@jlab.org"><lerose@jlab.org></a>,
            meekins <a class="moz-txt-link-rfc2396E" href="mailto:meekins@jlab.org"><meekins@jlab.org></a>, Glenn Young
            <a class="moz-txt-link-rfc2396E" href="mailto:gyoung@jlab.org"><gyoung@jlab.org></a>, <a class="moz-txt-link-abbreviated" href="mailto:wines@jlab.org">wines@jlab.org</a>, Walt Akers
            <a class="moz-txt-link-rfc2396E" href="mailto:akers@jlab.org"><akers@jlab.org></a>, rom <a class="moz-txt-link-rfc2396E" href="mailto:rom@jlab.org"><rom@jlab.org></a>, Lorelei
            Carlson <a class="moz-txt-link-rfc2396E" href="mailto:lcarlson@jlab.org"><lcarlson@jlab.org></a></td>
        </tr>
      </tbody>
    </table>
    <br>
    <br>
    <meta http-equiv="content-type" content="text/html;
      charset=ISO-8859-1">
    <u><b>Electrical:
      </b></u><br>
        There will be an electrical outage of the Accelerator Site on
    <br>
        Saturday,
    May 21st, 2011 starting at 7:00 AM that will last <br>
        from 8 - 10 hours.
    Only generator power will be available to <br>
        the Halls.
    <br>
    <br>
        On Saturday, June 4th, 2011 there will be another electrical <br>
        outage
    on the Accelerator Site from 7:00 AM lasting 8 - 10 <br>
        hours. Only
    generator power will be available to the Halls.
    <br>
    <br>
        The Test Lab will not be directly effected by these outages.
    <br>
    <br>
        During the 12 Month Down:
    <br>
    <br>
        The feeders to the Halls (currently aluminum) will be upgraded
    to
    <br>
        copper. This will require an outage of roughly 1 week to 9 days
    <br>
        for each of the Halls. <b>The outages will NOT be concurrent.
    </b><br>
    <br>
        Additionally, a similar, <b>non-concurrent </b>outage ( 7-9
    days)
    will
    <br>
        impact the Counting House, the ESR, the Physics Storage Building
    <br>
        and the Experimental Staging Facility. In all, 35 transformers
    on
    <br>
        the accelerator site will be upgraded.
    <br>
    <br>
        Paul Powers will provide a draft schedule of the outages to the
    <br>
        Hall Coordinators who will identify how the schedule can be
    adjusted
    <br>
        to minimize impact.
    <br>
    <br>
        NOTE: Although this work is essential, it is part of the
    cancelled
    <br>
        UIM project and funding must be identified before it can
    proceed.
    <br>
    <br>
    <u><b>Mechanical:</b></u>
    <br>
        During the 6 Month Down Carroll Jones will be upgrading the
    <br>
        control system for the LCW. The work will be conducted in
    Building
    <br>
        92, but will have an impact on the Halls. During the upgrade
    (which
    is
    <br>
        slated to begin in late August), the Halls will be without LCW
    for
    <br>
        3 to 4 weeks.
    <br>
    <br>
        Ed Folts noted that <b>they MUST have LCW by October 1</b> to
    begin
    <br>
        commissioning the magnets.
    <br>
    <br>
        Additionally, a <b>one day </b>shutdown of chilled water will
    be
    scheduled
    <br>
        near the end of this outage. This outage will result in Doug
    Tilles
    <br>
        being required to power down all systems in the Hall B and
    sealing
    <br>
        the area to prevent warming.
    <br>
    <br>
    <u><b>Space:
      </b></u><br>
        Facilities will be converting the ARC library into 36 sets for
    users.
    <br>
        The proposal currently includes compact workstations with 57
    inch
    tall
    <br>
        walls. The area will be managed using a hotel approach.  Details
    are
    <br>
        forthcoming.
    <br>
    <br>
        Because this space should be ready for occupancy in May of 2011,
    <br>
        we should begin the process of identifying users who are best
    suited <br>
        for this location as soon as possible.<br>
    <br>
    <u><b>Counting House:<br>
      </b></u>    Preliminary designs for the second floor of the
    Counting
    House have<br>
        been completed, and a overview image is attached.  <br>
    <br>
    <u><b>Future Work:</b></u><br>
        Facilities mentions that they continue to need Work Orders  to
    be
    <br>
        submitted as early as possible.
    <br>
    <br>
    Best wishes, <br>
    <br>
    Walt<br>