I'm fine with it, but I got to thinking and the buffer dewar may cause a problem because it isn't on UPS power yet (IOC might loose its kernel because of network switches) and the level signal isn't hard wired as of yet.  Chris Bass is going to order a replacement for their level meter that has a 0-10V output but it may be a bit before that happens.  I'm not sure how this will affect hdice and it may be minimal.  I think this is something that Chris and Andy would be concerned about.<br><br>Regards,<br>Krister<br><br>----- Reply message -----<br>From: "burkert" <burkert@jlab.org><br>Date: Tue, Oct 25, 2011 07:02<br>Subject: [Hallb-engineering] Fwd: Hall B Power Outage<br>To: "Stepan Stepanyan" <stepanya@jlab.org>, "Valeri Koubarovski" <vpk@jlab.org>, "Eugene Pasyuk" <pasyuk@jlab.org>, "F.-X. Girod" <fxgirod@jlab.org>, "George Jacobs" <jacobsg@jlab.org>, <hallb-engineering@jlab.org>, "Serguei Boiarinov" <boiarino@jlab.org><br><br>Hi all,<br><br>Does anyone have objections as to the date and time when the utility <br>power will be killed for<br>the HDIce emergency power test?<br><br>Volker<br><br><br><br>-------- Original Message --------<br>Subject:         Hall B Power Outage<br>Date:      Mon, 24 Oct 2011 15:50:17 -0400<br>From:  Paul Powers <powersp@jlab.org><br>To:       Doug Tilles <tilles@jlab.org>, David Kashy <kashy@jlab.org>, Volker <br>Burkert <burkert@jlab.org><br><br><br><br>To All,<br><br>Power outage to confirm connection of Andy Sandorfi's equipment to<br>Emergency Power Circuits.  Will kill all utility power, clean power and<br>utility power in Hall B.  Only emergency power will remain on.<br><br>This power outage will be done on Friday at 8:00 AM unless you get with<br>me before that and arrange a different day or time.<br><br>Thanks, Paul<br><br><br><br>