<p>Below find the long awaited good news from the Torus magnet
front. <br>
</p>
<p>Stay tuned!<br>
</p>
<p>Volker<br>
</p>
<div class="moz-forward-container"><br>
<br>
-------- Forwarded Message --------
<table class="moz-email-headers-table" border="0" cellpadding="0"
cellspacing="0">
<tbody>
<tr>
<th align="RIGHT" nowrap="nowrap" valign="BASELINE">Subject:
</th>
<td>Torus power-up</td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap" valign="BASELINE">Date: </th>
<td>Tue, 11 Oct 2016 19:17:42 -0400 (EDT)</td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap" valign="BASELINE">From: </th>
<td>Cesar Luongo <a class="moz-txt-link-rfc2396E" href="mailto:luongo@jlab.org"><luongo@jlab.org></a></td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap" valign="BASELINE">To: </th>
<td>Dave Kashy <a class="moz-txt-link-rfc2396E" href="mailto:kashy@jlab.org"><kashy@jlab.org></a>, Allison Lung
<a class="moz-txt-link-rfc2396E" href="mailto:lung@jlab.org"><lung@jlab.org></a>, Volker Burkert
<a class="moz-txt-link-rfc2396E" href="mailto:burkert@jlab.org"><burkert@jlab.org></a>, Glenn Young
<a class="moz-txt-link-rfc2396E" href="mailto:gyoung@jlab.org"><gyoung@jlab.org></a>, Ruben Fair
<a class="moz-txt-link-rfc2396E" href="mailto:rfair@jlab.org"><rfair@jlab.org></a>, Pasyuk Eugene
<a class="moz-txt-link-rfc2396E" href="mailto:pasyuk@jlab.org"><pasyuk@jlab.org></a>, Latifa Elouadrhiri
<a class="moz-txt-link-rfc2396E" href="mailto:latifa@jlab.org"><latifa@jlab.org></a>, Leigh Harwood
<a class="moz-txt-link-rfc2396E" href="mailto:harwood@jlab.org"><harwood@jlab.org></a>, mont <a class="moz-txt-link-rfc2396E" href="mailto:mont@jlab.org"><mont@jlab.org></a>,
George Biallas <a class="moz-txt-link-rfc2396E" href="mailto:biallas@jlab.org"><biallas@jlab.org></a>, Probir Ghoshal
<a class="moz-txt-link-rfc2396E" href="mailto:ghoshal@jlab.org"><ghoshal@jlab.org></a>, Renuka Rajput-Ghoshal
<a class="moz-txt-link-rfc2396E" href="mailto:renuka@jlab.org"><renuka@jlab.org></a>, rossi patrizia
<a class="moz-txt-link-rfc2396E" href="mailto:rossi@jlab.org"><rossi@jlab.org></a>, Javier Gomez
<a class="moz-txt-link-rfc2396E" href="mailto:gomez@jlab.org"><gomez@jlab.org></a>, Nicholas Sandoval
<a class="moz-txt-link-rfc2396E" href="mailto:sandoval@jlab.org"><sandoval@jlab.org></a>, Wesley Moore
<a class="moz-txt-link-rfc2396E" href="mailto:wmoore@jlab.org"><wmoore@jlab.org></a>, Christiana Wilson
<a class="moz-txt-link-rfc2396E" href="mailto:grenoble@jlab.org"><grenoble@jlab.org></a>, Pablo Campero Rojas
<a class="moz-txt-link-rfc2396E" href="mailto:campero@jlab.org"><campero@jlab.org></a>, Brian Eng <a class="moz-txt-link-rfc2396E" href="mailto:beng@jlab.org"><beng@jlab.org></a>,
Ramakrishna Bachimanchi <a class="moz-txt-link-rfc2396E" href="mailto:bachiman@jlab.org"><bachiman@jlab.org></a>, Tyler
Lemon <a class="moz-txt-link-rfc2396E" href="mailto:tlemon@jlab.org"><tlemon@jlab.org></a>, Scot Spiegel
<a class="moz-txt-link-rfc2396E" href="mailto:spiegel@jlab.org"><spiegel@jlab.org></a>, Krister Bruhwel
<a class="moz-txt-link-rfc2396E" href="mailto:bruhwel@jlab.org"><bruhwel@jlab.org></a>, Douglas Tilles
<a class="moz-txt-link-rfc2396E" href="mailto:tilles@jlab.org"><tilles@jlab.org></a>, Bob Miller
<a class="moz-txt-link-rfc2396E" href="mailto:rmiller@jlab.org"><rmiller@jlab.org></a>, Mark Todd
<a class="moz-txt-link-rfc2396E" href="mailto:mtodd@jlab.org"><mtodd@jlab.org></a>, Onish Kumar
<a class="moz-txt-link-rfc2396E" href="mailto:okumar@jlab.org"><okumar@jlab.org></a>, Sarin Philip
<a class="moz-txt-link-rfc2396E" href="mailto:philip@jlab.org"><philip@jlab.org></a>, David Gelhaar
<a class="moz-txt-link-rfc2396E" href="mailto:gelhaar@jlab.org"><gelhaar@jlab.org></a></td>
</tr>
</tbody>
</table>
<br>
<br>
<pre>Dear All,
Today, we successfully started the Torus energization phase of commissioning.
We were able to exercise the power supply/magnet system as a whole, first manually, and then through
the EPICS screens. We did a number of pre-checks at 10 A and 20 A, and then executed the first step of
the procedure with ramps to 100 A at different rates, and in both polarities. All I&C systems were fully
operational and the data collected showed expected behavior. There were a few bugs on display screens
in reverse polarity, but the system switched smoothly and without any glitch from + to -
The next step is to ramp to 350 A, exercise the fast dump, and test some of the interlocks. It was a
very successful day that puts us in very solid footing to keep marching towards full current operation.
Thank you Team!