<div dir="ltr">Dear Stepan, <div>   The RTPC is signed OFF now from our side. We still need an admin to signed off the Hall B Controls.</div><div><br></div><div>Regards,</div><div>Mohammad. </div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Tue, Feb 11, 2020 at 10:40 AM Stepan Stepanyan <<a href="mailto:stepanya@jlab.org">stepanya@jlab.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex">Dear all,<br>
<br>
We are planning to close Hall B and go to controlled access sometime in the early afternoon today. Please make sure that your system is ready for the run and is signed OFF in the HCO system. As of now, MVT, RTPC, and beamline are not signed OFF.<br>
<br>
After closing to controlled access, the solenoid will be energized. When you make an access please stay out of roped areas.<br>
<br>
Regards, Stepan<br>
PDL</blockquote></div><br clear="all"><div><br></div>-- <br><div dir="ltr" class="gmail_signature">Best regards,<br>Mohammad Hattawy.<br></div>