<html><body><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Hello,</div><div><br data-mce-bogus="1"></div><div>Tyler and I have been working on the HallB Pre-Power Interlock checkout Procedure - P027 this morning. There are total of 51 task, this morning we complete with 7 of them. Out of the remain tasks 28 of them involve the Quench Detection and Voltage Tap Panel. The other work that is being done needs to be finished before we can perform the check out procedure. Also there is an incorrect reference drawing for the "Test Hardware interlock Current Lead Water Flow" tasks. </div><div><br data-mce-bogus="1"></div><div>Pablo Campero </div></div></body></html>