[Hallb] Fwd: [Hps] HPS shifts are on beginning Thursday, Dec. 4, SWING
Nathan Baltzell
baltzell at jlab.org
Wed Dec 3 22:52:27 EST 2014
Hi Everyone,
See email below from John Jaros, the Hall-B Run Coordinator as of today.
His email to hallb at jlab.org didn't go through.
-Nathan
Begin forwarded message:
> From: "Jaros, John A." <john at slac.stanford.edu>
> Subject: [Hps] HPS shifts are on beginning Thursday, Dec. 4, SWING
> Date: December 3, 2014 8:54:21 PM EST
> To: "'hallb at jlab.org'" <hallb at jlab.org>, "hallb-engineering at jlab.org" <hallb-engineering at jlab.org>, "hps at jlab.org" <hps at jlab.org>
>
> Dear All,
>
> Hall B is scheduled to be locked up Thursday swing when HPS shifts will resume. The HPS program
> includes commissioning beam to the tagger dump, then to the Hall B dump, and ECal and trigger
> commissioning and calibration.
>
> Except for some brief interruptions, the machine plans to deliver beam until December 22.
>
> Everyone assigned shifts is expected to have taken all their safety training prior to taking their first shift.
> This includes the Hall B walk through (call Stepan to arrange). Everyone needs a dosimeter to take shifts.
>
> If you are unable to take shifts and haven't arranged for a substitute, please let me know asap.
>
> John Jaros
> RC
>
>
>
>
> _______________________________________________
> Hps mailing list
> Hps at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hps
More information about the Hallb
mailing list