<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Dear all,</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Just got a call from the crew chief, the new pragnoses for a beam to Hall-B is 2-3 am. Considering that planned PQB studies will start in the morning and Hall-B will be down for at least 8 hours, I am canceling owl and day shifts for Saturday. <span style="color: rgb(0, 0, 0); font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt;">Swing
 shift on Saturday should report as scheduled.</span></div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<span style="color: rgb(0, 0, 0); font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt;"><br>
</span></div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<span style="color: rgb(0, 0, 0); font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt;">Regards, Stepan</span></div>
<div id="appendonsend"></div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> Hallb-engineering <hallb-engineering-bounces@jlab.org> on behalf of Stepan Stepanyan <stepanya@jlab.org><br>
<b>Sent:</b> Friday, June 14, 2019 9:19 AM<br>
<b>To:</b> 'Hps@jlab.org'; Hallb-eng; hallb@jlab.org<br>
<b>Subject:</b> [Hallb-engineering] Machine status and shifts</font>
<div> </div>
</div>
<div style="background-color:#FFFFFF">Dear all,<br>
<br>
CEBAF restoration is on track to have first beams to hall later today. There are still few issues to work out but if all goes well we should expect beam late today or over weekend. Tentatively we agreed to have hall lock up around 5pm.
<br>
<br>
<b>Attention for shifters, current plan is to man the shifts stating from swing shift day!</b> This may change if some unexpected will happen, so please check your emails periodically. 
<br>
<br>
HPS is getting close to sign off system readiness, more will be discussed at 2pm during the RC meeting.<br>
<br>
Regards, Stepan <br>