[Hallc_running] [New Logentry] RC daily update
simona at jlab.org
simona at jlab.org
Fri Mar 30 13:00:01 EDT 2018
Logentry Text:
--
Since yesterday we completed the 25 deg data taking with SHMS and the positron running at 21 deg, all targets. This morning we changed configuration for both SHMS and HMS to commence the boiling studies. Soon we will be going to the 8 deg running with SHMS for the EMC effect experiment. Another boiling study at lower rates is needed and that will be conducted after the 8 deg running.
>From the MCC meeting this morning: beam for production will be delivered throughout the weekend. There will be a 4 hours period of beam studies on Monday starting with 8:30 am. Hall C can take an access, if needed. It is still to be decided whether the RF recovery scheduled tentatively for Tuesday is needed.
We will briefly meet today at 1:30 pm.
Link: https://bluejeans.com/543903672
Connecting directly from a room system?
1) Dial: 199.48.152.152 or bjn.vc
2) Enter Meeting ID: 543 903 672
Just want to dial in on your phone?
1) Direct-dial with my iPhone or
+1.408.740.7256 (United States)
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (Alternate number)
(Global Numbers)
2) Enter Meeting ID: 543 903 672
3) Press #
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3551635
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20180330/e4fe5a51/attachment.html>
More information about the Hallc_running
mailing list