[Hallc_running] [New Logentry] Hall C status
simona at jlab.org
simona at jlab.org
Fri Feb 8 14:50:02 EST 2019
Logentry Text:
--
We are ready for beam:
--> LH2 target is ready; TO's are watching it
--> target is now in home and so is the radiator (radiator is out of beam)
--> SHMS and HMS magnets are energized for the first kinematic setting in the J/psi experiment: https://logbooks.jlab.org/entry/3649006 , https://logbooks.jlab.org/entry/3649044
--> SHMS and HMS angles have been set: https://logbooks.jlab.org/entry/3648971 , https://logbooks.jlab.org/entry/3648968
--> The DAQ has been switched by Sylvester to COIN mode and we took a cosmic run after, it looks good; we are currently taking a run triggering on cosmics and 10 Hz from pulser
--> monitoring histograms for detectors look O.K.
--> the HMS shutter issue has been addressed; shutter is now open in preparation for beam (huts doors are closed)
A plan for the ion chambers calibrations is in place (thanks to Daniel Moser for his diligence on this): https://logbooks.jlab.org/entry/3648965 , https://logbooks.jlab.org/entry/3648987
MCC just took us to power permit.
They still need the "beam authorization" for C (according to the crew chief work in building 95 has been completed: https://logbooks.jlab.org/entry/3648962)
They are now setting up Hall B (Hall D took an access for now, however: https://logbooks.jlab.org/entry/3649036).
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3649064
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20190208/7a551a68/attachment-0001.html>
More information about the Hallc_running
mailing list