We have been getting low current in Hall C over night (not by choice). Our physics rates would have easily allowed for double the beam current, at very least. We've been taking data at the middle epsilon point, Q2 = 0.375 and W=2.2. We completed 3 out of 4 SHMS angle settings here. This morning we rotated SHMS to the last angle needed to complete the data taking at this epsilon point.
There is a planned accelerator down (as far as beam availability to the halls is concerned) to re-configure the 20 Amp supplies and then tune to hopefully allow for high current beam delivery to Hall C and decent beam to Hall A.
We decided to take advantage of this and put Hall C in restricted access to allow Neil to implement the temporary fix for the HMS LCW leak.
This work has been completed as of 12:40 pm and we tested rotation in the hall to larger HMS angle (34 deg) which will be needed soon to make sure the hose Neil installed does not impede rotation.
We will be ready to lock up the hall by early afternoon and we will wait for beam.
We will have a RC meeting at 4:30 pm on the second floor of the counting house. Here is how to connect: https://bluejeans.com/861439920
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3702388
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20190711/9beb5474/attachment.html>
More information about the Hallc_running
mailing list