[Hallc_running] [Revised Logentry] RC daily update
mnycz at jlab.org
mnycz at jlab.org
Thu Aug 13 14:30:07 EDT 2020
Logentry Text:
--
It has been an eventful day shift
The Moller measurement took all of day and most of swing yesterday. Bill and Murchhana were able to finish up late swing. Thanks to Bill and Murchhana for staying late to finish!
The Moller result --> https://logbooks.jlab.org/entry/3826006
After Moller, we started back to production on the polarized Helium-3 cell
We have some had target related issues / hiccups
It was noticed at the beginning of owl that Laser Spectrum Monitor Peak was oscillating--> https://logbooks.jlab.org/entry/3826153
Melanie has spent the morning with the target experts trying to debug the QWP rotation stage controller
We tried to turn on the camera to see the QWP, but with no luck (it was already on. Brad suggested it may have gotten unplugged). We followed the instructions in --> https://hallcweb.jlab.org/wiki/index.php/Pol_He-3_Rotation_Stages#Power_to_camera_and_lamp_in_Optics_Box
We took an escorted access and I found the power strip the camera and light were connected was turned off. After turning back on, the camera was up an running (for a few minutes at least)
https://logbooks.jlab.org/entry/3826483
As of 12:10 pm, Work is still being done on the QWP rotation stage controller to ensure we have control over it.
The NMR measurement decreased during OWL shift.
https://logbooks.jlab.org/entry/3826336
We will meet today at 4:15pm via Bluejeans 861439920 : https://hallcweb.jlab.org/wiki/index.php/RC_Update_and_Run_Plan_for_Aug_13,_2020#Current_Run_Plan
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3826544
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20200813/084e0d58/attachment.html>
More information about the Hallc_running
mailing list