[Hallc_running] [New Logentry] RC Update
hszumila at jlab.org
hszumila at jlab.org
Sun Nov 7 11:40:02 EST 2021
Logentry Text:
--
The 5-pass high current CW beam over night went relatively well, and so the pass change to 3-pass began this morning after the PD 10am meeting.
The plan for accelerator is to change us to 3-pass and to take the beam energy measurement during the day shift. We can expect physics beam early on swing shift.
Bishnu and I rotated the HMS out to 31.15 deg (real is 31.13 deg) for the start of run tonight. There were no issues with the rotation, but I do have concerns with the "slinky"-like movement around the 20-deg angle. We will watch this.
We plan to begin the 3-pass run plan this afternoon.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3938341
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20211107/b717c53b/attachment.html>
More information about the Hallc_running
mailing list