[Hallc_running] [New Logentry] RC Report: Monday, August 15
mdiefent at jlab.org
mdiefent at jlab.org
Mon Aug 15 17:50:02 EDT 2022
Logentry Text:
--
<p><strong><span style="font-family: Helvetica; font-size: 12px;">Getting Ready for the Pass Change: RC Report August 14-15</span></strong><br style="font-family: Helvetica; font-size: 12px;"><br style="font-family: Helvetica; font-size: 12px;"><strong><span style="font-family: Helvetica; font-size: 12px;">Accelerator Status </span></strong></p><ul><li><span style="font-family: Helvetica; font-size: 12px;">Problem with bleed through to Hall B is significantly reduced after turning the vertical separator on. </span></li></ul><p><strong><span style="font-family: Helvetica; font-size: 12px;">Experimental Status</span></strong></p><ul><li><span style="font-family: Helvetica; font-size: 12px;">DAQ issues during owl shift (https://logbooks.jlab.org/entry/4029021). </span></li><li><span style="font-family: Helvetica; font-size: 12px;">Preparation for the data taking in the Q2 = 2.12 GeV^2, W = 2.05 GeV, x = 0.39, high epsilon setting: Vladimir Berdnikov, Walter Kelln!
er, Stanly Madlock, Jerry Nines, and Robert Wilkinson installed SHMS aerogel tray SP-15 (</span><span style="font-family: Helvetica; font-size: 12px;">https://logbooks.jlab.org/entry/4029238</span><span style="font-family: Helvetica; font-size: 12px;">). Their controlled access lasted four hours. </span></li><li><span style="font-family: Helvetica; font-size: 12px;">Regarding the problems with the temperature sensor for the HMS Q2 LH2 Coil 2: Heidi Fansler checked the sensor during the controlled access. We need to wait for the next Maintenance Day to fix the sensor (</span><span style="font-family: Helvetica; font-size: 12px;">https://logbooks.jlab.org/entry/4029182</span><span style="font-family: Helvetica; font-size: 12px;">). </span></li></ul><p><br style="font-family: Helvetica; font-size: 12px;"><strong><span style="font-family: Helvetica; font-size: 12px;">Data taking for the Pion-LT experiment (E12-19-006) with a beam energy of 8.487 GeV</span></strong></p!
><ul><li><span style="font-family: Helvetica; font-size: 12px;!
">We have completed data taking for the: </span></li><ul><li><span style="font-family: Helvetica; font-size: 12px;">Q2 = 3.85 GeV^2, W = 3.07 GeV, x = 0.31, low epsilon setting, </span></li><li><span style="font-family: Helvetica; font-size: 12px;">Q2 = 2.45 GeV^2, W = 3.20 GeV, x = 0.21, middle epsilon setting, </span></li><li><span style="font-family: Helvetica; font-size: 12px;">Heep-check coincidence runs, </span></li><li><span style="font-family: Helvetica; font-size: 12px;">SHMS calibration at negative polarity. </span></li></ul><li><span style="font-family: Helvetica; font-size: 12px;">After the aerogel change, we are taking data for the Q2 = 2.12 GeV^2, W = 2.05 GeV, x = 0.39, high epsilon setting. </span></li></ul><p><br style="font-family: Helvetica; font-size: 12px;"><strong><span style="font-family: Helvetica; font-size: 12px;">Instructions for shift crew </span></strong></p><ul><li><span style="font-family: Helvetica; font-siz!
e: 12px;">Regarding the insulating vacuum alarms for the SHMS: Please read the instructions from Heidi Fansler: </span><span style="font-family: Helvetica; font-size: 12px;">https://logbooks.jlab.org/entry/4028513</span><span style="font-family: Helvetica; font-size: 12px;"> </span></li><li><span style="font-family: Helvetica; font-size: 12px;">Regarding the temperature alarms for HMS Q2 LH2: Please disregard the alarm for now: </span><span style="font-family: Helvetica; font-size: 12px;">https://logbooks.jlab.org/entry/4029182</span><span style="font-family: Helvetica; font-size: 12px;"> </span></li></ul><p><br style="font-family: Helvetica; font-size: 12px;"><strong><span style="font-family: Helvetica; font-size: 12px;">Planning </span></strong></p><ul><li><span style="font-family: Helvetica; font-size: 12px;">We will request the pass change for tomorrow, August 16, to start data taking with a beam energy of 6.399 GeV. </span></li><li><span s!
tyle="font-family: Helvetica; font-size: 12px;">On Wednesday, August 17!
, we aim to change the aerogel tray back to SP-11. </span></li><li><span style="font-family: Helvetica; font-size: 12px;">Starting from August 18, we need volunteers for shifts: </span><span style="font-family: Helvetica; font-size: 12px;">https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-PIONLT-2022</span><span style="font-family: Helvetica; font-size: 12px;"> </span></li><li><span style="font-family: Helvetica; font-size: 12px;">We will have a Hall C RC meeting on Tuesday, August 16, at 11:00 a.m. (EDT). </span></li></ul>
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4029413
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20220815/8ecb8d7f/attachment-0001.html>
More information about the Hallc_running
mailing list