[Hallc_running] [New Logentry] RC report
arunts at jlab.org
arunts at jlab.org
Thu Jul 14 08:20:03 EDT 2022
Logentry Text:
--
We continued to take production data on dummy target and with LH2 with a reduced beam current (https://logbooks.jlab.org/entry/4015130). Dave Mack finished BCM calibrations yesterday afternoon (https://logbooks.jlab.org/entry/4014904). We are taking advantage of the RF recovery day and have a number of tasks scheduled before we close back up and continue with the run plan. Let's have a brief RC meeting at 11:00 AM EST.
https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcE
Meeting ID: 160 710 0885 - Passcode: 595071
Plan for today:
Beam stops at 8:15 am and the hall will go into a controlled access.
8:15 AM - Radcon full survey
9:00 AM - Walter, tech - pumping on HMS transfer line (couple of hours)
10:00 ish - Jixie - camera adjustment on a parasitic detector (few mins)
10:00 ish - Jack & Ellen - LCW systems (couple of hours)
Instructions: Jack and Ellen will ramp down the power supplies for the super conducting modules in preparation for Heidi’s work.
11:00 ish - Heidi Fansler - Swapping lines, changing valves etc..(couple of hours)
1:00 PM - Dave Gaskell & student - Walkthrough (1 hour)
4:00 PM or whenever done, turn on all the power supplies for the super conducting modules and make sure that we are all set to continue with the run plan.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4015190
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20220714/137ac783/attachment.html>
More information about the Hallc_running
mailing list