[Hallc_running] [New Logentry] Hall C RC Summary: October 10, 2022
gaskelld at jlab.org
gaskelld at jlab.org
Mon Oct 10 09:00:03 EDT 2022
Logentry Text:
--
Yesterday afternoon, we completed the SHMS paddle study (results pending analysis) and then moved on to production running at 26 degrees. We started at the lowest momentum setting (P=1.95 GeV) to check the thresholds in the SHMS electron PID trigger (setting 9), and then moved on to the highest momentum setting (P=5.42 GeV, setting 1). This setting is expected to be fairly time consuming, but has also been slowed a little due to some issues with the horizontal separator on swing and owl shift.
There will be some interruption to beam delivery today to replace a flow switch in Arc 1. The plan for the next few shifts is to continue taking data at 26 degrees.
At the 11 am RC meeting this morning, I would like to discuss the outcome of the paddle study and possible changes to the SHMS electron trigger configuration.
RC meeting Zoom information:
Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
Meeting ID: 160 710 0885
Passcode: 595071
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4053813
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20221010/85f7a945/attachment.html>
More information about the Hallc_running
mailing list