[Hallc_running] [New Logentry] Hall C Status and RC Meeting at 11AM

mack at jlab.org mack at jlab.org
Mon Nov 13 09:55:01 EST 2023


Logentry Text:
--
Status: 
1. Beam energy change from 5 pass to 4 pass in progress. MCC will tune up our 4-pass beam to the BSY dump, then tune it to our dump. 
2. RadCon survey starts 09:30. Techs arrive for calorimeter move nominally at 10AM. Afterward, go to power permit to support the last part of the energy change.  

Notables from the last 24 hours:

New HV settings uploaded:   https://logbooks.jlab.org/entry/4219634

Finished positron background measurement and went back to elastics.

Encouraging LED results from last Friday by Julie R: https://logbooks.jlab.org/entry/4219763

Paul King's IA scan completed: https://logbooks.jlab.org/entry/4219774 

HMS dipole trip on lead-flow imbalance. Resolved in the middle of the nite by Joe B and Heidi F: https://logbooks.jlab.org/entry/4219806   (Thanks!!!)

Awesome elastic calibration plots with full statistics by Hao: https://logbooks.jlab.org/entry/4219807 

Wiki instructions on restarting the scaler server by ROM: https://logbooks.jlab.org/entry/4219825

Some more HV uploads for missed channels in the NPS calorimeter: https://logbooks.jlab.org/entry/4219864



We will meet at 11 at the usual place and on zoom at https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX... .





---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4219971
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20231113/dfd9d8d4/attachment.html>


More information about the Hallc_running mailing list