[Hallc_running] [New Logentry] Hall C Status and RC Meeting at 11 am
mack at jlab.org
mack at jlab.org
Wed Nov 15 10:10:02 EST 2023
Logentry Text:
--
Status: After smooth elastic data taking, we are currently down for a long accelerator maintenance day. The hall is in controlled access. (There were no requests for work in the hall until minutes after I announced at the 8am meeting that we'd try to stay in beam permit lol. Insert image of me rolling eyeballs. But seriously, we always owe our RadCon and ARM colleagues the courtesy of advance notice if possible, and this week RadCon is stressed with the Hall A dump work.)
Notables from the last 24 hours (it was a low drama day):
The JT7/8 motors were replaced. (It was realized that the relay failure a few days ago actually originated in a motor. Lead flow rates were OK with the dead motor, but would have been inappropriately stuck at that high level if the dipole were to trip overnite. The dead motor's twin was also pre-emptively replaced.) https://logbooks.jlab.org/entry/4220625
Hao's initial results from elastic running at 4 pass: https://logbooks.jlab.org/entry/4220830
The kinematics table was not updating automatically: https://logbooks.jlab.org/entry/4220873 (Is that still the case?)
Hanjie will take over as RC this afternoon.
We'll meet at 11 at the usual place and on zoom at https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX... .
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4220973
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20231115/0344c94d/attachment.html>
More information about the Hallc_running
mailing list