RC report - 02/08/2024
-------------------------------
Yesterday was beam studies and several different works did happen in the hall. The next beam studies period is scheduled for wednesday 2/14, MCC is expected to take the bean
away at 6am. Beam recovery to the Hall was taking time and the accelerator experiences several incidents which were resolved by the end of the swing shift. Physics data taking has been
progressing since the beginning of the owl shift.
Target ---> the fan of the LH2 loop is working appropriately
Front NPS temperature sensors ----> https://logbooks.jlab.org/entry/4249182
Incident : NPS VME crate 2 has to been rebooted, it is the same crate as at the previous owl shift. Watch it for a possible pattern.
Follow-up : watching charge asymmetry https://logbooks.jlab.org/entry/4249274
Request : Let me know as soon as possible any work that would need to happen during the next beam studies period
Link to 11:00 RC meeting
https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
Meeting ID: 161 701 5555
Passcode: 288953
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4249610
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20240208/87a326aa/attachment.html>
More information about the Hallc_running
mailing list