[Hallc_running] [New Logentry] RC report - 02/16/2024
yeran at jlab.org
yeran at jlab.org
Fri Feb 16 10:40:03 EST 2024
Logentry Text:
--
--------------------------------
RC Report - 02/16/2024
--------------------------------
=> Yesterday (Thursday, Feb.15) Dave Gaskel did a Moller measurements (~8:30am - 2pm) https://logbooks.jlab.org/entry/4252806, https://logbooks.jlab.org/entry/4252819 .
=> We got back to production run with kinematics KinC_x60_4a, with the targets LH2, Dummy, LD2 and the beam current 8uA-40uA.
Plans for upcoming days (Julie) https://logbooks.jlab.org/entry/4252342
---------------------------------
Friday (Feb.16.2024)
---------------------------------
1. Shifts - all SL shifts are cancelled for DAY / Swing
TO shifts are NOT cancelled. We need a target operator at CR.
2. Beam - OFF 7:45
3. Hall - 8:00 RadCon Survey
9:00 Controlled Access
4. Calorimeter - 4.1) Lock the NPS magnet (Joe Buffet)
4.2) Push the calorimeter to 9.5m (Jerry, Larruy and/or Rob, Yaopeng, Mitch)
4.3) Install the NPS board hanger on the platform (Jerry, Larry and/or Rob)
4.4) Test the bases from Ohio (Josh)
4.5) Remove col 20 and 21 (Yaopeng, Mitch)
4.6) Get S. Kennel to survey PMTs from col 20+21 by noon (Julie)
4.7) Remove col 22 and 23 (Cristine, Hao)
4.8) Disassemble PMT/bases col 20 and 21 upstairs-200A (Wassim- Mark- Charles-???)
4.9) Get S. Kennel to survey PMTs from col 22 and 23 before 4 pm (Julie)
5.0) Cut fibers (Julie)
5.1) Assemble PMT/bases for col 20 and 21 with bypassed bases (200A) (Julie - Mitch - Ed - ???)
---------------------------------
Saturday (Feb.17.2024)
---------------------------------
1. Shifts - all SL shifts are cancelled for Owl / DAY / Swing
TO shifts are NOT cancelled. We need a target operator at CR.
2. Beam - OFF
3. Hall - Controlled Access
4. Calorimeter - 4.1) Disassemble PMT/bases col 22 and 23 upstairs (Julie- Christine - Yeran)
4.2) Install column 20 (Wassim-Mark)
4.3) Assemble PMT/bases col 22 and 23 with bypassed bases upstairs (Julie- Wassim -Mark - ??)
4.4) Install column 21 (Yaopeng-Hao)
4.5) Check the optical coupling col 20 and 21 (Josh)
4.6) Adjust LV and start cosmic run (Josh, Yaopeng, Hao)
---------------------------------
Sunday (Feb.18.2024)
---------------------------------
1. Shifts - all SL shifts are cancelled for Owl / Day / Swing
TO shifts are NOT cancelled. We need a target operator at CR.
2. Beam - OFF
3. Hall - Controlled Access
4. Calorimeter - 4.1) Analyze cosmic run, adjust HV (Hao-Julie)
4.2) Install column 22 (Yaopeng-Christine)
4.3) Debug columns 20 and 21 (Yaopeng-Christine)
4.4) Install column 23 (Wassim-Mark)
4.5) Check optical coupling (Josh)
4.6) Adjust LV and start cosmic run (Josh- Wassim-Mark)
4.7) Analyze cosmic run, adjust HV (Hao-Julie)
4.8) Debug columns 22-23 (Mitch-Hao)
---------------------------------
Monday (Feb.19.2024)
---------------------------------
1. Shifts - all SL and TO shifts are NOT cancelled for
2. Beam - expecting to have beam back during the Owl shift (00:00??)
----------------------------
Involved Individuals
----------------------------
1) Julie Roche (jroche at jlab.org),
2) Charles Hyde (hyde at jlab.org),
3) Yeranuhi Ghandilyan (yeran at jlab.org),
4) Joshua Crafts (jpcrafts at jlab.org),
5) Hao Haung (hhaung at jlab.org),
6) Christine Ploen (cploen at jlab.org),
7) Yaopeng Zhang (yaopeng at jlab.org),
8) Mitchell Kerver (kerver at jlab.org),
9) Wassim Hamdi (wassim at jlab.org),
10) Mark Mathison (mathison at jlab.org),
11) Jordan O’Kronley (jo39kron at vols.utk.edu),
12) Joe Beaufait (beaufait at jlab.org)
13) Adam Hartberger /RadCon/ (adamh at jlab.org)
14) David Hamlette /RadCon/ (hamlette at jlab.org
15) Stephen Kennel /RadCon/ (kennel at jlab.org)
16) Jerry Nines /tech/ (jnines at jlab.org)
17) Larry Carraway /tech/ (larryc at jlab.org)
18) Rob Wilkinson (tech) robertw at jlab.org
19) Ed ???
Link to 11:00 RC meeting
https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
Meeting ID: 161 701 5555
Passcode: 288953
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4253178
-------------- next part --------------