[Hallc_running] [New Logentry] RC update, Feb. 28, 2024
sanghwa at jlab.org
sanghwa at jlab.org
Wed Feb 28 08:50:01 EST 2024
Logentry Text:
--
We had overall quiet shifts. We took DIS Carbon data yesterday during the Day shift, and switched to the Positron setting. We finished two cycles of positron data taking.
MCC took the beam off at 7am as planned for Maintenance + Beam study today. The beam restoration to the halls is expected to start around 19:30. We will swtich back to the electron setting and continue the production once the beam is back.
The schedule for today is posted here: https://logbooks.jlab.org/entry/4258072.
>From our side, RadCon is surveying the hall now. We will then go to controlled access and stay that way until 3pm or so.
Hall access schedule: https://logbooks.jlab.org/entry/4258144
Please take a look at the list, and let the RC know if you have work to do in the hall.
We will meet at 11am for our daily RC meeting, in the 2nd floor conference room of CH.
Zoom connection link:
https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
Meeting ID: 161 701 5555
Passcode: 288953
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4258149
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20240228/ab2b91d5/attachment.html>
More information about the Hallc_running
mailing list