After recovering from the PSS problems, we continued with production running at kinC_x36_5'. Radcon swept the hall this morning after beam was taken away from us at 6:45 am. A status of all the work being done in the hall is shown below. We will move to a higher kinematic setting after resumption beam based on the run plan (https://logbooks.jlab.org/files/2024/01/4245597/NPS_5Pass_2024.pdf). Hall B requested a IHWP flip tomorrow morning (roughly 12 hours after beam is recovered after the maintenance day). Let's have an RC meeting at 11:00 am EST today.
https://zak.zoomgov.com/j/1617015555?from=join#success
Passcode 288953
Best regards,
Arun
Things to address during the maintenance day on Wednesday:
1. Larry, Rob and Jerry – need to place a bunch of seals on SHMS Q1, Q2, and Q3 (3 keys) - in progress
2. Joe Beaufait – Walkthrough for two people in the morning at 11 am (3 keys)
3. Heidi – check out electronics for ePAS (1 key) - done
4. Steve Lassiter – tour of vendors for Hypernuclear (4 keys) - done
5. Ellen Becker – swap out and recalibration for SHMS rotation encoder - scheduled for afternoon
Useful links:
Calibration coefficients using pi0: https://logbooks.jlab.org/entry/4245522
Issues with block 952: https://logbooks.jlab.org/entry/4245700
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4246003
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20240131/ba098691/attachment.html>
More information about the Hallc_running
mailing list