<div dir="ltr"><div dir="ltr"><div>Hi Everyone,</div><div><br></div><div>Around 18:30 last night, beam was restored and delivered to Hall-C at a maximum of 50uA.  Due to the extended time lost yesterday, beam studies will be truncated from all day-shift to 8:30 - noon.  We are still on kinematic-4, and still plan to stay with it through the end of the experiment.  There are no planned changes or accesses needed today/tomorrow.  </div><div><br></div><div>Issues:</div><div><br></div><div>- At 23:00 we had an SHMS dipole interlock/slow-discharge and at 6:00 we had the same issue with Q3.  In both cases, Steve Lassiter was contacted, and he was able to fix the issue remotely.  We were able to ramp-up and recover without additional issues both times. See logbook entries <a href="https://logbooks.jlab.org/entry/3662259">https://logbooks.jlab.org/entry/3662259</a> and <a href="https://logbooks.jlab.org/entry/3662360">https://logbooks.jlab.org/entry/3662360</a>.</div><div>- We are having target white alarms every 3 hours or so.  It seems whatever was done to fix this before ( <a href="https://logbooks.jlab.org/entry/3660122">https://logbooks.jlab.org/entry/3660122</a>), is no longer fixing the problem.</div><div><br></div><div>There is no need for a 4:30 meeting today.  We will have one as usual on Monday.</div><div><br></div><div>-Michael</div><div><br></div></div></div>