[Hallcsw] Hall C Detector/SW status Meeting -- 22 Feb 2017, 11am EST (L210A)
Brad Sawatzky
brads at jlab.org
Mon Feb 20 22:36:21 EST 2017
Hi all,
The next Hall C Detector/SW status Meeting will be
11am EST, 22 Feb 2017 in Room L210A
Note that we will meet in the 'usual' Hall C software meeting room
above the atrium (L210A).
I'd appreciate a quick status update from the Detector owners. Same
general format as last week, but with a focus on what is 'broken/todo'
and/or what has been corrected since the last meeting.
If you have a short update -- feel free to just email me prior to the
meeting and I will pass it on to the group.
Please take a first pass putting your documentation on the wiki as
indicated in the 'General' section below.
-- Brad (et al.)
----- Bluejeans connection info ------
Computer link:
https://bluejeans.com/895800575/
To join via phone :
1) Dial:
+1.408.740.7256
+1.888.240.2560
+1.408.317.9253
(see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 895800575
======================= Very Rough Notes from Feb 15, 2017 =======================
--------------------------------
GENERAL:
--------------------------------
* All groups are requested to update documentation on the wiki.
We will use these as references for shift crew later. See links under
'System Owners' here:
https://hallcweb.jlab.org/wiki/index.php/Wednesday%2C_February_07%2C_2017#System_Owners
* Use the 'HMS Drift Chambers' entries as an example
- Links should point to documents in the DocDB
- Don't just upload to the wiki.
* Please ensure any hardware changes you make get put in the HCLog.
Even if they shouldn't matter to others, it is very useful to
have the history logged *AND* a record of where people have been
working. (Sometimes another group's cable gets knocked loose, etc.)
--------------------------------
MISC:
--------------------------------
- Gunning: Raster pickoffs available
- need to get them in to the DAQ
- Wood: V2F hardware available but signals need to be set up (confirm)
- ie. BCMs, etc
- Ahmed: scaler checks to be done
- plug a known pulser in to channels and verify maps
- need to verify that the xscaler displays on hcdesk machines,
mapping is correct
- Jure: Event display
- two viewers, one for HMS, one for SHMS
- Jure will check that the viewers work on the hcdesk machines
--------------------------------
HMS:
--------------------------------
* Remove the Aerogel and place in clean room for repairs [Hamlet]
- Brad: update wiki with note that Aerogel will not be available
- Eric Pooser: Jack was involved in pulling the Aerogel -- not sure
if Aerogel is out yet
--------------------------------
SHMS:
--------------------------------
- Drift Chambers [*Christy, Biswas]
- now resurveyed
- no tracks from the analyzer yet, Jure is trying to figure out the
PARAM file settings
- working on chasing remaining missing signals
- plan to do voltage scan and check efficiency with new Eth:Ar mix
- need to do drift times and T0 calibration in the software
- Hodoscopes [*Malace, Jones]
- difficulties with restoring HV this morning (Wed)
- Simona would like to be the person who manages HVs for hodoscopes for now
so she can watch for problems
- quartz plane status: stable
- Shower/Pre-shower [*Mkrtchyan, Yerevan]
- Trip currents updated in GUI
- Please don't change HVs without contacting Hamlet
- Ask Chuck will turn the Shower fans on -- just leave them on
Preshower
- All channels good
- Gains are high, can see muons in all channels
- May need to remove amplifier and replace with passive splitter
- Be sure to communicate with Brad before doing this.
* Active splitters removed for now. Can reinstall passive splitters later
(post-KPP)
Shower:
* One bad PMT (confirmed)
- block is outside acceptance, so maybe fix in summer?
- Aerogel Cerenkov [*Arthur, Horn]
- splitter was removed
- all 14 signals are now present (missing channel restored)
- good signals observed
- NGC [*D. Day, Pooser]
- Tank will be filled with Argon after it is installed.
- Waiting for installation into the SHMS stack (presently on the Hall C
floor)
- HV and signal cables are run and verified into DAQ upstairs
- PMT targets removed 2/16; tank read for installation
- HGC [Huber, *Li]
- Will be filled with CO2.
- Pump and fill is in progress this week (Brad)
- all channels look alive
- hardware and basic software set up is in good shape
- may want to switch FADCs front-end digitizer FSR to 2V later
More information about the Hallcsw