[Halld-cal] Fwd: Log entry notification: : Plan for maintenance day April 19
Elton Smith
elton at jlab.org
Wed Apr 18 17:13:14 EDT 2012
-------- Original Message --------
Subject: Log entry notification: : Plan for maintenance day April 19
Date: Wed, 18 Apr 2012 17:10:02 -0400 (EDT)
From: elton at jlab.org
To: elton at jlab.org
1755787 <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1755787> Plan
for maintenance day April 19
18-Apr-2012 16:57 E_Smith HDFCALTEST
<http://opsweb.acc.jlab.org/CSUEApps/elog/elog.php?logbook=HDFCALTEST>
The beam will be down tomorrow and Hall B will be open. The accelerator plan is to
change the energy per pass to 1.1 GeV and change Hall B from 3-pass to 5-pass
beam. Hall B will be installing the HPS beam test together with the clas12 silicon
strips.
The beam will go down at 6:30 am and going to restricted access by about 7 am.
They anticipate being open till late in the evening and lock up before midnight.
Hall D major tasks for tomorrow are
1. Remove the downstream readout board first thing in the morning. During the day,
replace the electronic board with the extra "optimized" board in F117. At the same
time check on the attachment of the cooling tube to the cooling plate and repair. After
complete testing of the readout assembly, return to Hall B and reinstall on the mini-
Bcal.
2. Place radiation badges on/near the mini-Bcal to monitor radiation dose. Take
photos of monitors on location for reference.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/halld-cal/attachments/20120418/3e1bccd4/attachment.html
More information about the Halld-cal
mailing list