[Halld-cal] Cal Working Group Meeting tomorrow

Elton Smith elton at jlab.org
Mon Sep 23 16:54:12 EDT 2013


Dear colleagues,

We will have our bi-weekly Cal Working group meeting tomorrow at 11:00. 
The tentative agenda is below. Update as necessary.

Cheers, elton.


= Tentative Agenda =

# Announcements
# [[GlueX-Collaboration-Oct-2013|October Collaboration Meeting]]
# Action Items
# Monitoring
# FCAL
# BCAL
#* Moved BCAL into solenoid!
#* Photos 
[http://gluex.phys.uregina.ca/content/photo/downstream-view-bcal-after-installation 
Downstream View], 
[http://gluex.phys.uregina.ca/content/photo/upstream-view-bcal-after-installation 
Upstream View], 
[http://gluex.phys.uregina.ca/content/photo/closeup-upstream-view-bcal-after-installation-four-support-strips-are-visible 
Closeup Upstream View]
#* Removed readout assemblies from both sides of six modules (33-37 and 
41) for inspection
#* All electronics dry. No visible damage
#* Assemblies on the rail pads very tight. Need to remove inside plate 
on some in order to take them off. This should be standard procedure.
#* Downstream no visible anomalies.
#* Upstream, boundary between module 41 and 40 showed a thicker dark 
band at interface (about 1-2 fibers instead of 0.5-1), but did not 
appear to be due to insertion of the module. Seems consistent with 
Regina archival photo 
[http://kronos.phys.uregina.ca/~zisis/travellers/Mod41/photos/Mod41R.jpg 
End 2 Image].
#* Conclude: no damage found due to insertion of the BCAL into the solenoid.
# Reconstruction and Simulation
# TDR update
# Calibration of Calorimeters
# Any other business

-- 
Elton Smith
Jefferson Lab MS 12H5
12000 Jefferson Ave STE 16
Newport News, VA 23606
(757) 269-7625
(757) 269-6331 fax



More information about the Halld-cal mailing list