[Halld-cal] [New Logentry] Follow-up Re: Follow-up Re: BCAL restored after power outage / scaler rates
elton at jlab.org
elton at jlab.org
Fri Mar 27 08:20:02 EDT 2015
Logentry Text:
--
This morning, presumably after new thresholds have been loaded into the discriminators, we have the same rate profile as before the shutdown with the three "hot" channels.
---