[Halld-cal] [New Logentry] HCO Bcal detector checklist completed for fall run
elton at jlab.org
elton at jlab.org
Tue Sep 27 09:45:01 EDT 2016
Logentry Text:
--
<ul><li>Based on the referenced log entry, I have checked off the detector section of the Bcal HCO checklist.</li><li>We plan to operate under the same conditions as during the spring run:</li><li>The chillers are set to T=5 degC, Vover=1.4 V above breakdown. </li><li>Backup voltage files for this period have links to the same files that were used in the spring run.</li><li>Response of fADCs that occassionally come up blank still need to be investigated. </li><li>The RTD on 2D is reading 10 degC below other temperatures and will be checked, but we do not intend to pull the module if the problem is internal.</li></ul>
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3422916
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-cal/attachments/20160927/6c6d4e90/attachment.html>
More information about the Halld-cal
mailing list