[Halld-cal] FCAL2 Meeting - 202410-02

Timothy Whitlatch whitey at jlab.org
Thu Oct 3 12:48:07 EDT 2024


I have updated the schedule on the wiki  based on Sasha's input and attach here.

Cheers,

Timothy Whitlatch, PE State of Virginia
Hall D Chief Engineer
Jefferson Lab
757-876-1766
________________________________
From: Alexander Somov <somov at jlab.org>
Sent: Wednesday, October 2, 2024 6:32 PM
To: Hall-D Calorimetry <halld-cal at jlab.org>; Zisis.Papandreou <Zisis.Papandreou at uregina.ca>; Scot Spiegel <spiegel at jlab.org>; Joshua Ballard <ballardj at jlab.org>; Timothy Whitlatch <whitey at jlab.org>
Subject: Re: FCAL2 Meeting - 202410-02

Hi Tim,

I made some small modifications to the schedule; will review it further.

The schedule depends on the availability of the HV distribution
boards, which have not yet been ordered. Based on previous experience,
it could easily take two months to receive the boards, so we need a
backup solution (I think that we have one)


Complete LV cable/panel install   10/2      -  10/9/24

Repair LMS known issues           10/7      -  10/21

Connect final HV cables           11/8* (?) -  11/14      float

Test HV controls and final        11/15     -  11/21
test LMS
(fan and cooling required)

Insulate the face of the detector 11/22    -   11/26

Install LMS reference PMTs        11/22     -  12/5    (RadCon posts)

Final test of all channels        11/27     -  12/15
(fan and cooling required)

Cosmics/LMS testing               12/1      -  1/24/25
(break in of the detector. Fan, cooling required. Test temperature stability)


Is not clear whether all LG channels will be fixed by the time we start
cooling (11/15/24)


*) if the HV boards will arrive


Cheers,
               Sasha

________________________________
From: Halld-cal <halld-cal-bounces at jlab.org> on behalf of Timothy Whitlatch via Halld-cal <halld-cal at jlab.org>
Sent: Wednesday, October 2, 2024 4:10 PM
To: Hall-D Calorimetry <halld-cal at jlab.org>; Zisis.Papandreou <Zisis.Papandreou at uregina.ca>; Scot Spiegel <spiegel at jlab.org>; Joshua Ballard <ballardj at jlab.org>
Subject: Re: [Halld-cal] FCAL2 Meeting - 202410-02

Hi All,

I have uploaded (to the action items, also attached) my first shot at scheduling the remaining activities in order to try to make this effort as efficient as possible.

Beni, Sasha and Malte, can you please have a look and let me know what should be changed?

Thanks,

Timothy Whitlatch, PE State of Virginia
Hall D Chief Engineer
Jefferson Lab
757-876-1766
________________________________
From: Halld-cal <halld-cal-bounces at jlab.org> on behalf of Zisis Papandreou via Halld-cal <halld-cal at jlab.org>
Sent: Wednesday, October 2, 2024 3:31 PM
To: Hall-D Calorimetry <halld-cal at jlab.org>
Subject: [Halld-cal] [EXTERNAL] FCAL2 Meeting - 202410-02

Hello all:

The minutes from this morning’s meeting have been posted:
https://halldweb.jlab.org/wiki/index.php/FCAL2_Meeting_2024-10-02

Our next meeting and some Action Items are here:
https://halldweb.jlab.org/wiki/index.php/FCAL2_Meeting_2024-10-09

Folks, please feel free to add to or modify that list.

Thanks and cheers, Zisis…


Dr. Zisis Papandreou
Head, Department of Physics
Professor of Physics, Ph.D., P.Phys.
---------------------------------------------------------
Department of Physics
University of Regina
3737 Wascana Parkway
Regina, SK  S4S 0A2  CANADA

Phone: (306) 585-5379
Email:  zisis at uregina.ca<mailto:zisis at uregina.ca>
Website: http://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou<https://urldefense.proofpoint.com/v2/url?u=http-3A__www.uregina.ca_science_physics_people_faculty-2Dresearch_zisis-2Dpapandreou_index.html&d=DwMGaQ&c=CJqEzB1piLOyyvZjb8YUQw&r=qOykDDW07dxNIz2gqzRW_0sRJeff1E30DnojDqga1Jo&m=j_fbcHDb1fZF6cWXSGBYEEhx8ORBH0QDU2CkcH7ixi6gFqDMlPeK1vZi0W7IfEVA&s=kXYkzLpCN5VjDG30q69UOiXfFagNYfbgEI56PbVjqm4&e=>


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-cal/attachments/20241003/cdd99615/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: FY25_FCAL2_Install-checkout_v4.pdf
Type: application/pdf
Size: 176635 bytes
Desc: FY25_FCAL2_Install-checkout_v4.pdf
URL: <https://mailman.jlab.org/pipermail/halld-cal/attachments/20241003/cdd99615/attachment-0001.pdf>