<html>
  <head>
    <meta content="text/html; charset=ISO-8859-1"
      http-equiv="Content-Type">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <div class="moz-cite-prefix">Hi, <br>
      <br>
      I posted the minutes of the controls meeting on the wiki, and <br>
      also pasted into this message. <br>
      <br>
<a class="moz-txt-link-freetext" href="https://halldweb1.jlab.org/wiki/index.php/Controls_Meeting_23-Jan-2014#Minutes">https://halldweb1.jlab.org/wiki/index.php/Controls_Meeting_23-Jan-2014#Minutes</a><br>
      <br>
      Hovanes. <br>
      <br>
      <br>
      <h1><span class="mw-headline" id="Minutes">Minutes</span></h1>
      <p>Present: Mark S., Jonathan, Elton, Orlando, Scot, Dave B.,
        Eugene, Hovanes
      </p>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_23-Jan-2014&amp;action=edit&amp;section=4"
            title="Edit section: Announcements">edit</a>]</span> <span
          class="mw-headline" id="Announcements"> Announcements </span></h3>
      <ul>
        <li> Hovanes will be organizing the slow controls meetings. The
          meetings will be held biweekly. The scope of the meeting will
          need to be better defined,needs to be coordinated with Tim. </li>
        <li> Orlando Soto from Chile is visiting us for 6 months. He
          will be working with Hovanes and Elton on BCAL slow controls.
        </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_23-Jan-2014&amp;action=edit&amp;section=5"
            title="Edit section: UPS requirements">edit</a>]</span> <span
          class="mw-headline" id="UPS_requirements"> UPS requirements </span></h3>
      <ul>
        <li> According to 12GeV schedule, we need to procure or install
          UPS systems in the Hall and the tagger Hall. While the tagger
          hall has a single location where a UPS will need to be placed,
          Hall D may require UPS power outlets at various locations.
          <ol>
            <li> We need to define the total maximum power required for
              each location to be able to define the circuit. </li>
            <li> We need to estimated the power consumption and the
              required duration by the subsystems requiring backup power
              during actual outage. </li>
          </ol>
        </li>
      </ul>
      <ul>
        <li> Hovanes asked people working on slow controls components to
          define the UPS requirements by the next slow controls meeting
          (2 weeks).
          <ul>
            <li> Jonathan will work with Dave and Yi to define the
              solenoid needs for UPS power. </li>
            <li> Dave already had a list of the PLC equipment installed
              in the hall with the power ratings, he will need to come
              up with estimates of the power consumption during power
              outages. </li>
            <li> Hovanes will define the UPS requirements for the
              motorized applications and for the network switches in the
              hall. Eugene pointed out that the motorized application in
              the hall may not need to be on UPS, but it needs to be
              considered.
            </li>
          </ul>
        </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_23-Jan-2014&amp;action=edit&amp;section=6"
            title="Edit section: Action Items">edit</a>]</span> <span
          class="mw-headline" id="Action_Items"> Action Items </span></h3>
      <ul>
        <li> Hall D solenoid UPS requirements (Jonathan, Dave)
        </li>
        <li> PLC equipment (+target) requirements for UPS (Dave)
        </li>
        <li> Motor-based applications' requirements for UPS (Hovanes)
        </li>
        <li> Network switches requirements for UPS (Hovanes)
        </li>
      </ul>
      <br>
    </div>
  </body>
</html>