    <div class="moz-cite-prefix">Hi, <br>
      I posted the minutes of todays controls meeting at <br>
      <br>
<a class="moz-txt-link-freetext" href="https://halldweb1.jlab.org/wiki/index.php/Controls_Meeting_6-Mar-2014#Minutes">https://halldweb1.jlab.org/wiki/index.php/Controls_Meeting_6-Mar-2014#Minutes</a><br>
      <br>
      and pasted them to this message. <br>
      Hovanes. <br>
      <br>
      <br>
      <h2><span class="mw-headline" id="Minutes">Minutes </span></h2>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_6-Mar-2014&amp;action=edit&amp;section=4"
            title="Edit section: UPS for Solenoid">edit</a>]</span> <span
          class="mw-headline" id="UPS_for_Solenoid"> UPS for Solenoid </span></h3>
      <ul>
        <li> Dave's estimate is that we need a 20 Amps 120 VAC circuit
          for the solenoid controls racks. </li>
        <li> Solenoid controls need 15 minutes time to park into the
          safe condition. What power solenoid controls will require for
          those 15 minutes still need to be determined. </li>
        <li> Although Dave included the cryotarget PLc controls
          requirement in his spreadsheet, the power for the equipment
          from the JLab target group has not been taken into account.
          Dave will need to talk to the target group to find out what
          else is needed in terms of UPS power for the target. </li>
        <li> The information about U1-5 rack in Dave spreadsheet needs
          to move near where the gas panel is on the upstream platform
          since currently there no PLC in U1-5 and there are no plans.
          Hovanes will need to move it in his PDF file as well. </li>
        <li> Elton pointed out that motors in the hall need to be on UPS
          as well to be able to park them in the safe position when
          power is lost. The current plan includes it, according to
          Hovanes. </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_6-Mar-2014&amp;action=edit&amp;section=5"
            title="Edit section: FCAL pulser">edit</a>]</span> <span
          class="mw-headline" id="FCAL_pulser"> FCAL pulser </span></h3>
      <ul>
        <li> Orlando presented his work on control screens for the FCAL
          pulse. </li>
        <li> CSS GUIs are ready to control the bias, power, pulsing and
          trigger synchronization of the pulser.
        </li>
        <li> Some error messages show up on the console that Orlando
          would like to debug before putting them into SVN. </li>
        <li> Elton suggested that Orlando show the GUIs to Indiana group
          for feedback. </li>
        <li> Elton also suggested to have a general convention for ALL
          controls screen what the message on a control button says. His
          suggestion is that the message should describes the action
          that pushing the button will lead to rather than the status of
          what quantity the button is linked to. </li>
        <li> Orlando will start working on the pulser control of the
          BCAL, which should be similar to FCAL pulser control. </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_6-Mar-2014&amp;action=edit&amp;section=6"
            title="Edit section: FDC MPOD interlock status">edit</a>]</span>
        <span class="mw-headline" id="FDC_MPOD_interlock_status"> FDC
          MPOD interlock status </span></h3>
      <ul>
        <li> Dave got a description of the FDC chiller output from the
          manufacturer. He used a 24V output to control a relay which
          controls the 5V that goes to the 9-pin DSUB connector on the
          MPOD controller. </li>
        <li> The FDC power interlock system is currently installed and
          operational. </li>
        <li> Hovanes and Beni pointed out that the MPOD controller will
          need to be configured for this interlock to be functional.
          Otherwise, the default configuration of the controller will
          ignore the absence of 5V on the DSUB connector and will not
          shut down the voltages. This would need to be included into
          MPOD swapping procedure.
        </li>
        <li> Dave is working on the BCAL power supply and chiller
          interlock. He is expecting the parts required for the
          interlock to arrive sometime soon.
        </li>
      </ul>
      <h2><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_6-Mar-2014&amp;action=edit&amp;section=7"
            title="Edit section: Action Items">edit</a>]</span> <span
          class="mw-headline" id="Action_Items"> Action Items </span></h2>
      <ul>
        <li> Dave will estimate how much power solenoid controls require
          during the 15 minutes after the power goes away. </li>
        <li> Dave will talk to target people find out what their
          equipment need in terms of UPS and send an e-mail to the
          mailing list. </li>
        <li> Orlando will check in the GUIs and scripts for the FCAL
          pulser into SVN and show them to Indiana group.
        </li>
      </ul>